Week one (part two)

The rest of the first week was mostly demo. When I went upstairs the next day all of the trash was gone. Amazing! They carted it away in a dump truck which made several trips to the house over the course of the day. They carted the trash down in heavy duty garbage cans and dumped it in the truck.


 One surprise that I could see, once all the demo trash was gone, was this pipe in the ceiling of the 3rd floor which will be the dining area. I think it is an old gas line that once fed a gas light fixture. I hoping they can pull out all of the old pipes. They are no lover connected to the gas line which was capped 40+ years ago.
 Someone wanted to be in a picture....note the privacy cardboard on the right. The crew is keeping this bathroom functioning as much as possible during the reno.